Drain Pit for Washing Sterilization Carts (Ampoule Production)

Article number:

Unavailable

Material

AISI 316L
  • AISI 316L
  • AISI 304
Description

This stainless steel floor drain is designed for hygienic cleaning of sterilization carts used in ampoule manufacturing. It ensures fast drainage and cleanroom safety.

 

Full description

Stainless Steel Drain System for Safe Cleaning of Sterilization Carts in Ampoule Production

The unit is intended for installation in pharmaceutical clean zones where sterilization equipment is washed. Tailored to the specifics of ampoule production, the drain enables safe and efficient water removal during cart cleaning, preventing cross-contamination.

Manufactured from high-grade AISI 304 or 316L stainless steel, the system resists detergents, steam, acids, and other aggressive agents.
The sealed construction includes a sloped drainage chamber and an optional removable perforated grate that prevents clogging and ensures safe cart movement. Smooth welds and rounded edges allow for quick and complete cleaning.

🔧 Specifications:

  • Material: Stainless steel AISI 304 / 316L
  • Grate: Perforated, removable (optional)
  • Purpose: Water drainage during cart washing
  • Design: Sloped, leak-proof construction
  • Production: Custom dimensions and configuration
  • Standards: GMP, ISO compliant

Key advantages:

  • Specifically designed for ampoule sterilization areas
  • Anti-slip, safe for wheeled carts
  • Easy to clean and maintain
  • Resistant to chemicals and temperature shifts
  • Manufactured to your technical requirements

Each unit is manufactured with attention to the specific needs of your production process.

📩 Contact us for a custom quote and consultation.

Capital repair and modernization of equipment

  • development of design documentation
  • modernization and restoration
  • FAT, SAT, IQ/OQ

Overhaul of screws for ampoule/vial transportation

  • repair inserts
  • restoration of mounting seats
  • еlimination of runout

Overhaul of needles for aseptic drug filling

  • needle tip restoration
  • tube replacement
  • polishing

CNC machining within 72 hours based on your model

  • production time — from 72 hours
  • anodizing and finishing
  • engineering design tailored to your task
  • comprehensive approach — from sketch to packaging