Single Seat Mixproof Valve

Numer artykułu:

Na zamówienie

Size

1.5"
  • 1.5"
  • 2"
  • 2.5"
  • 3"

Material

AISI 304
  • AISI 304
  • AISI 316 L

Gaskets

EPDM
  • EPDM
  • FPM
  • Silicone
Opis

    The Stainless Steel Sanitary Grade Single Seat Mixproof Valve offers sizes from DN40 to DN100 and operates at a maximum pressure of 6BAR with a working temperature range of -10°C to +120°C. It features a RA0.5um surface finish, SS304 or SS316L contacted parts, and uses EPDM, silicone, or FPM sealing. Ideal for easy maintenance and CIP cleaning, it is suitable for use in food, beverage, and pharmaceutical industries, with welded, threading, or triclover connections.


    Pełny opis

    Features of the Stainless Steel Sanitary Grade Single Seat Mixproof Valve:

    Size: DN40-DN100;  11/2”-4”

    Max. Pressure: 6BAR

    Working temperature:-10℃ to +120℃

    Air connection size: R1/”

    Surface: Inner RA0.5um

    The contacted parts: SS304 or SS316L

    Sealing: EPDM, silicone or FPM

    Connection type: welded, threading, triclover end

    Limit switch type: 6-36V  DC  2-3 nos NPN or PNP

    C top: AS-I connection  24-48V AC/DC 3个PNP/NPN  

    Max travel range≤80mm

    Less space

    Easy maintenance

    No dead angle

    No contacting between drain system and products

    The separating chamber cleaning does not occur any hydraulic-pressure

    CIP cleaning can be done any time whenever the valve is open or close

    The single seat mixproof valve is controlled by the pressed air. Normally the valve is closed. There are two small pneumatic valves in the two sides of the mixproof valve. One is detecting valve. The other is CIP valve.

    Remont kapitalny i modernizacja urządzeń

    • opracowanie dokumentacji projektowej
    • modernizacja i renowacja
    • FAT, SAT, IQ/OQ

    Generalny remont ślimaków do transportu ampułek/flakonów

    • wkładki naprawcze
    • regeneracja gniazd montażowych
    • eliminacja bicia

    Remont kapitalny igieł do aseptycznego napełniania preparatów

    • odtworzenie końcówki igły
    • wymiana rurki
    • polerowanie

    Obróbka CNC w 72 godziny na podstawie Twojego modelu

    • czas realizacji — od 72 godzin
    • anodowanie i obróbka wykończeniowa
    • projektowanie inżynieryjne dopasowane do zadania
    • kompleksowe podejście — od szkicu do pakowania