Pharmaceutical Transition Bench with Shoe Compartments

Article number:

Available for pre-order

Material

AISI 316L
  • AISI 316L
  • AISI 304
Description

A hygienic stainless steel bench with compartments for footwear or PPE storage. Ideal for transfer areas between non-clean and clean zones.

 

Full description

Cleanroom Entry Bench with Integrated Shoe and PPE Storage

Designed for airlocks, dressing rooms, and transition areas, this bench facilitates footwear changes before entering cleanrooms. It features a sturdy seat — smooth or with anti-slip insert — and integrated compartments for clean/used shoes, overshoes, protective gear, or personal items.

Compartments may be open or fitted with hinged doors, depending on your needs.
The frame is made from corrosion-resistant stainless steel (AISI 304 or 316L), suitable for regular sanitization. The bench supports up to 150 kg per seat and complies with GMP and ISO 5–8 cleanroom standards.

🔧Technical specifications:

  • Material: Stainless steel AISI 304 / 316L
  • Design: Bench with open or closed storage compartments
  • Seat: Smooth or with non-slip insert
  • Finish: Polished or matte (Ra ≤ 0.8 μm)
  • Dimensions: Standard or custom
  • Load capacity: Up to 150 kg per seat

Advantages:

  • Maintains clean/non-clean zone separation
  • Organizes shoe and PPE storage hygienically
  • Withstands chemical cleaning and daily use
  • Built to fit room layout and access logistics
  • Ideal for cleanroom entry points and buffer zones

Our team is ready to advise you and offer the most effective solution. Choose quality and reliability — order today!

Capital repair and modernization of equipment

  • development of design documentation
  • modernization and restoration
  • FAT, SAT, IQ/OQ

Overhaul of screws for ampoule/vial transportation

  • repair inserts
  • restoration of mounting seats
  • еlimination of runout

Overhaul of needles for aseptic drug filling

  • needle tip restoration
  • tube replacement
  • polishing

CNC machining within 72 hours based on your model

  • production time — from 72 hours
  • anodizing and finishing
  • engineering design tailored to your task
  • comprehensive approach — from sketch to packaging