Hygienic Quick-Load Spring Check Valve

Article number:

Available for pre-order

Size

19
  • 19
  • 25
  • 32
  • 38
  • 51
  • 63
  • 76
  • 89
  • 102

Material

AISI 304
  • AISI 304
  • AISI 316 L

Gaskets

EPDM
  • EPDM
  • Silicone
Description

The Stainless Steel Hygienic Quick Loading Weld Spring Check Valve is designed for vertical installation with a pressure range of 0.2 to 10 bar. Made from SS304 or SS316L, it features FDA-approved EPDM or silicone gaskets and is easy to clean with a compact design. Suitable for food, beverage, dairy, pharmaceutical, and chemical industries, it operates with a flow direction from bottom to top and has an inside surface finish of Ra 0.4.

Size
Full description

Features of the Stainless Steel Hygienic Quick Loading Weld Spring Type Check Valve:

The valves can be installed in vertical pipeline only.
The min. pressure difference is 0.08bar to open the valve.

Flow direction is from the bottom to the top side only.

Asept, Non retention dead angle, easy to clean, easy to maintenance.

Operating temperature:-10 degree to 120 degree.

Valve disc is made from casting..

Valve body is made from forging.

Valve body type: clamped or nut type.

Gasket: EPDM, silicone.

All gaskets are FDA approved.

Max. Pressure: 10BAR

Min. Pressure: 0.2BAR

Compact design, easy maintenance and high torque.

Connection end: Weld, tri-clamped, male threading.

Standard: DIN, SMS, 3A.

Material: SS304, SS316L.

Inside surface finish: Ra0.4.

Size: DN20-DN100 ,  3/4"-4".

Application: Food, beverage, dairy, pharmacy, chemical or any food processing industries.

Capital repair and modernization of equipment

  • development of design documentation
  • modernization and restoration
  • FAT, SAT, IQ/OQ

Overhaul of screws for ampoule/vial transportation

  • repair inserts
  • restoration of mounting seats
  • еlimination of runout

Overhaul of needles for aseptic drug filling

  • needle tip restoration
  • tube replacement
  • polishing

CNC machining within 72 hours based on your model

  • production time — from 72 hours
  • anodizing and finishing
  • engineering design tailored to your task
  • comprehensive approach — from sketch to packaging